国产一区二区日本-www.99日本精品片com-青青青青青青草-亚洲制服无码-全国男人的天堂网-在线观看免费日韩av-国外成人免费视频-久综合-欧美性色黄大片人与善-首尔之春在线看-69久久99精品久久久久婷婷-在线看片-色婷婷欧美在线播放内射-手机日韩av-日韩一二三四区-国产精品黄色av-欧美乱大交做爰xxxⅹ小说-人妻少妇乱子伦精品-国产成人毛毛毛片-aaa在线



The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps:



1. check the size matching,

2. installation, and

3. testing.


The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!


Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.


Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation of fluency.


When connecting, it is necessary to ensure that the coaxiality between the two is consistent.

If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.


When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.


After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured.

If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation.


When gears or other components are externally installed during transmission, protective devices need to be installed.


After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.


The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.


An installation notice will be provided with each gearbox Motoreducer sells. You can refer to it and make sure it is done according to the right process!




Phone

Phone

17715386183

Address

Address

No.10 Haizhou Road, Binhai Industrial Park, Qidong City, Jiangsu Province